国产99久久久久久免费看,CAOPORN国产精品免费视频,狠狠色噜噜狠狠狠狠97首创麻豆,中文字幕无码毛片免费看

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
亚洲人成网站观看在线播放 | 野花社区日本在线观看免费观看3 97精品国产97久久久久久免费 | 国产精品主播一区二区三区| 日韩精品一区二区三区四区蜜桃| 国产一区二区三区不卡av| 人妻被按摩师玩弄到潮喷| 国产69精品久久久久777| 公交车上拨开少妇内裤进入| 国产精品无码成人午夜电影| a片在线观看免费| 国产精品99久久久久久宅男| 欧美 亚洲 国产 另类| 久久精品国产精品亚洲| 国产偷v国产偷v亚洲高清| 国产a片| 性生交大片免费看| 精品久久久久久无码人妻中文字幕 | 日韩精品久久久久久免费| 久久久久99精品成人片三人毛片| 亚洲人成亚洲人成在线观看| 国产精品天堂avav在线| 亚洲毛片| 狠狠婷婷综合久久久久久| 51午夜精品免费视频| 亚洲国产av一区二区三区四区 | 日韩欧美一区二区三区免费观看| 亚洲日韩av无码| 无码人妻一区二区三区色欲av| 超清中文乱码字幕在线观看| 破處女特級a片在线观看| 国产亚洲精品久久久久久久| 人人爽人人澡人人高潮| 国产精品免费看久久久无码| 又爽又黄无遮挡高潮视频网站| 国产成人亚洲精品| 免费做爰猛烈吃奶摸视频在线观看| 国产午夜片无码区在线播放| 国产精品va在线播放我和闺蜜| 啦啦啦WWW日本高清免费观看| 天堂√最新版中文在线| 久久久久久精品免费无码无|